On September 20, 2023, Pakistan local time, the water pressure test of waste heat boiler No. 1 of Pakistan Binjiashin III 900MW combined cycle Power Station project, which was made by our company, was successful, marking a stage victory for the installation of waste heat boiler body, and laying the foundation for the pickling and blowpipe work of waste heat boiler.(Reported by Manufacturing Department on September 21, 2023)