On September 20, 2023, Pakistan local time, the water pressure test of waste heat boiler No. 1 of Pakistan Binjiashin III 900MW combined cycle Power Station project, which was made by our company, was successful, marking a stage victory for the installation of waste heat boiler body, and laying the foundation for the pickling and blowpipe work of waste heat boiler.(Reported by Manufacturing Depart...
2023-09-21